成年女人黄小视频,欧美人与禽猛交狂配,国产乱子伦,69国产成人精品午夜福中文

Product & Service

Adding Grounding test column for GZ Metro Line 3


There is a large amount of maintenance in the Low voltage cabinet. The original equipment has not fully considered the grounding wire hanging position during the overhaul and brought big inconvenience to the daily overhaul. 

After full assesment on the equipment, we design a complete plan and add Grounding device for Guangzhou Metro Line 3.







eee.png


ttt.png
451.jpg



Engineer mounting the 

equipment.


Part of the detail




Succesfully adding the 

Grounding Device